Downloadable Woodworking Project Plan to Build Money-Hungry Giraffe Bank
Item #412233DModel DP-00427
Regular price$7.95
Sale price$7.95
Was
$7.95
Unit price/ per
Kids will go animals as the coins they feed this friendly creature zigzag down its neck and deposit in the see-through bank. MATERIALS NOT INCLUDED; DO. . .
View More Details
Don't cut up your patterns! These huge sheets of graphite paper not only make transferring patterns easier because of their size, they almost eliminate the mess you get when using carbon paper sheets to do the transfers. Each package contains Six 18" x 24" sheets .
Transfer full-size patterns to plywood
Eliminates the mess of carbon paper
18" x 24" sheets
Each package contains 6 sheets
Save your patterns for future use
Wood Magazine
Downloadable Woodworking Project Plan to Build Scrollsawn Fishy Puzzle
+$7.95
Wood Magazine
Downloadable Woodworking Project Plan to Build Scrollsawn Fishy Puzzle
Kids will love it to pieces! Scrollsawers and kids will appreciate the clever design and eye-popping colors of this Russell Greenslade original. Look closely and you?ll spot not one but three bright fish going for a swim.
Measures aproximately 7in. x 15in..
MATERIALS NOT INCLUDED; DOWNLOADABLE WOODWORKING PLAN ONLY
Wood Magazine
Downloadable Woodworking Project Plan to Build Scrollsawn Brilliant Birds Puzzle
+$5.95
Wood Magazine
Downloadable Woodworking Project Plan to Build Scrollsawn Brilliant Birds Puzzle
Russell Greenslade?s puzzles aren?t just playthings; many people display them as art. And the designs are great fun to scrollsaw. This plan includes two of Russell?s originals, both of which make great year-round gifts.
Puzzles measure aproximately 9in. tall, and 5in. tall.
MATERIALS NOT INCLUDED; DOWNLOADABLE WOODWORKING PLAN ONLY
The versatile Pica-Dry® Longlife Automatic Pencil marks and writes on all surface materials, as well as dusty, raw, oily, wet and dark surfaces, and can be wiped off glossy surfaces with a wet tissue.
Features:
Writes on all surface materials
Automatic lead support
Built-in sharpener in the front of the cap
Stainless steel tub
Convenient quiver cap with special clip
What's Included:
(1) Pica-Dry - 3030 Longlife Automatic Pencil
Notes:
Item #160112 - Pica® Dry Refill Set #4020, Assorted Color is a water-soluble refill pack.
The Pica 4030 Graphite Refill for the Pica Dry® Longlife Automatic Pen is a water soluble “multiuse” lead. The 4030 graphite can be used on almost every surface, no matter if wet or dry, glossy or rough, dusty or oily, and can be wiped clean from glossy surfaces with a damp towel. The Pica 4030 leads come already sharpened and inside a sturdy, reusable plastic box.
· 10 leads for Pica-Dry Longlife Automatic Pen
· Sturdy, reusable plastic box
· Can be used on multiple surfaces
· Wipe clean with a damp cloth
· Leads are already sharpened
Total Price
$7.95
Downloadable Woodworking Project Plan to Build Money-Hungry Giraffe Bank
by Wood Magazine
About This Product
Kids will go animals as the coins they feed this friendly creature zigzag down its neck and deposit in the see-through bank.
MATERIALS NOT INCLUDED; DOWNLOADABLE WOODWORKING PLAN ONLY